Actions

From WanWiki

Jump to: navigation, search

This is meant as a kind of blog/dairy/etc. for what's happening around the place

--> Todo List

  • 3 Mar 2010 (Sat)
    • Marlow
      • Link from PBP to Mervue established, reconnecting segments there into the main network


  • 11 Jan 2010 (Mon)
    • Marlow
      • Link from Turloughmore to Galway established, reconnecting segments there into the main network


  • 12 Dec 2009 (Sat)


  • 29 Oct 2009 (Wed)
    • Mick and Sean
      • Moved Moycullen 2 node up the hill. Bit higher, less Roscahill more Knockroe.


  • 25 Aug 2009 (Tue)
    • Mick
      • Fix of Rahoon Hill (rhh) node after waterlogging issue (unfinished)
    • Mick and Marlow
      • Build of Dangan Heights node
      • Move of spare panel in PBP towards Kingston


  • 15 Jun 2009 (Mon)
    • Seamus
      • Seamus has installed a car-battery in the interim to get the Headford node online
    • Marlow
      • Configuration of Headford node, reconnected Rosscahill 3 here, but unfortunatly very poor signal, so work will have to be done on the other side


  • 14 Jun 2009 (Sun)
    • Seamus and Marlow
      • New node in Headford build. Seamus just has to sort the power yet.
The node is bolted to a concrete wall.
Enlarge
The node is bolted to a concrete wall.
Seamus inspecting the work.
Enlarge
Seamus inspecting the work.



















  • 16 Mar 2009 (Mon)
    • Marlow
      • After server-move a couple of days ago, doc.thewan.net has been upgraded to Debian Lenny and got a few optimizations (better network drivers etc.). IPv6 connectivity was also fixed again.


  • 21. Feb 2009 (Sat)
    • Mick
      • Connected new node on Inish Mor. Now the wan is on all three islands!



  • 04. Jan 2009 (Sun)
    • Mick
      • Installed new node in Carraroe. Linked to Carraroe 1.